Close Menu
    Facebook Instagram LinkedIn
    • العربية (Arabic)
    • English
    • Français (French)
    Facebook Instagram LinkedIn
    Middle East Transparent
    • Home
    • Categories
      1. Headlines
      2. Features
      3. Commentary
      4. Magazine
      5. Cash economy
      Featured
      Headlines Yusuf Kanli

      Mojtaba Khamenei: From silent heir to Supreme Leader

      Recent
      13 March 2026

      Iran Alone

      13 March 2026

      A Farewell to a Mind That Spoke with History: In memory of Prof. Dr. İlber Ortaylı

      13 March 2026

      Lebanon’s failure to disarm Hezbollah keeps doing greater damage

    • Contact us
    • Archives
    • Subscribe
    • العربية (Arabic)
    • English
    • Français (French)
    Middle East Transparent
    You are at:Home»PPP Govt pressured army to suspend the new GHQ project‏

    PPP Govt pressured army to suspend the new GHQ project‏

    0
    By Sarah Akel on 31 October 2008 Uncategorized

    LAHORE: The Pakistan Army’s decision to suspend the construction of its new multi-billion General Headquarters in Islamabad due the worsening economic crisis faced by the country is largely motivated by the Zardari government’s opposition to the project in line with the Pakistan Peoples Party’s persistent stance since 2004 that the shifting of the GHQ in the middle of civilian sectors could literally turn the federal capital into a military cantonment besides putting civilian population at risk.

    Since the inauguration of the Rs60 billion GHQ project by former president and army chief General (retd) Pervez Musharraf in September 2004, the PPP leadership had been arguing that there is no need to move the General Headquarters of the Pakistan Army less than 20 kilometers from its present location, especially in the present age of electronic communications and new insights on institutional coordination. A press statement issued by the Inter Services Public Relations (ISPR) Tuesday said: “The project of new GHQ’s construction in Islamabad has been suspended on the directives of Chief of the Army Staff General Ashfaq Parvez Kayani, as the army leadership shared the nation’s quest for economic stability through a spirit of sacrifice”.

    However, well informed official circles claim that the army high command had been moving ahead with its ambitious plan of shifting the General Headquarters from Rawalpindi to Islamabad despite facing opposition by the PPP government. According to them, it was only last month that the army leadership, following opposition of the project by the civilian government, had decided to raise funds for the same through disposal of prime properties of the army spread in the major cities all over Pakistan. The khakis’ decision was subsequently advertised in the national dailies on September 2, 2008, stating that both commercial and residential plots would be auctioned in Karachi, Lahore, Quetta and Rawalpindi on September 22, 2008. A Land Disposal Cell was also set up in the GHQ to generate funds for construction of the General Headquarters, the Ministry of Defence and the Joint Staff Headquarters.

    Asked as to who had approved the unique plan to offer prime state land in major cities for sale to raise funds for the GHQ’s construction, the official circles said it was the government of caretaker Prime Minister Mohammadmian Soomro who had okayed the proposal before the February 2008 elections. The Pentagon style military headquarters of the GHQ was being built on 100 acres of the Prime land in Islamabad while 20 acres each were reserved for the defence ministry and the Joint Staff Headquarters, respectively. The naval and air headquarters cover 30 and 40 acres respectively which have already been completed and shifted to the new site.

    The official circles say the special interest being shown by the khakis in the GHQ project could be gauged from the fact that the recently replaced Chairman of the Capital Development Authority Kamran Lashari was summoned to the GHQ in Rawalpindi recently and directed to clear on war footing basis any hurdles in the establishment of a new General Headquarters in Islamabad. The CDA boss was also instructed to relocate with the help of the Islamabad Capital Territory (ICT) all villagers from D-11 so that infrastructural development could be started there. And last but not the least, the CDA chairman was directed to construct different approach roads around the site of the GHQ headquarters.

    While performing the ground breaking of the GHQ project on September 6, 2004, General Pervez Musharraf had stated that the re-location of the headquarters of all three services at one place would ensure efficient working environment and create understanding among the staff at different tiers leading to better planning. However, Farhatullah Babar, then a senator as well as the spokesman of the PPP chairperson Benazir Bhutto, shot back, stating that the Musharraf regime had actually launched a huge housing scheme for the khakis in the name of the GHQ where residential units would be built at a cost of $2.4 billion over an area of 2,450 acres. His fellow Senators including Khawaja Saad Rafiq, Mushahidullah Khan and Syed Zafar Ali Shah had even claimed that it would be the only GHQ which would have 90 bungalows of six bedrooms each, 300 bungalows of four bedrooms each and 14,750 luxury apartments.

    Farhatullah Babar had again questioned the shifting of the GHQ on the floor of the house in December 2006 in the backdrop of media reports saying the Capital Development Authority had suffered a huge loss of approximately Rs504 billion by providing an additional 870 acres of land for the construction of the GHQ in Sector E-10. He had alleged at that time that the Capital Development Authority had been made to give 1400 acres of land for construction of the GHQ at the foot of the Margalla hills at a throw away price of Rs 180 per square yard, without even assessing the market rate in the area that was Rs110, 000 to Rs120,000 per square yard at that time.

    However, the ISPR spokesman was quick to defend the move at that time saying the land was purchased on the government directives after the price of the land was settled as per the rates being charged from other government departments and institutions which had to pay much lower than the commercial/auction value. The military spokesman had further rejected the dubbing of new GHQ as eighth wonder of the world as ludicrous propaganda, saying that the new GHQ building would focus on the improvement of functioning rather than providing luxury.

    Yet, the PPP remained stuck to its principles stance on the GHQ project even after the 2008 polls while the new government was being put in place. In April 2008, the media quoted Farhatullah Babar as saying: “We will stick to our old position and if we deviate from it, media will be justified to criticise us.” Asked by the media people as to how the party intends to reopen the GHQ case, Farhatullah Babar said he had a comprehensive plan that would be shared with the media later.

    amir.mir1969@gmail.com

    Share. Facebook Twitter LinkedIn Email WhatsApp Copy Link
    Previous ArticleSyrian Film Director Muhammad Malas Is Forbidden From Travelling Abroad
    Next Article With Oil Down, Will Iran Follow?

    Comments are closed.

    RSS Recent post in french
    • Le Liban entre la logique de l’État et le suicide iranien 3 March 2026 Dr. Fadil Hammoud
    • Réunion tendue du cabinet : différend entre le Premier ministre et le chef d’état-major des armées, qui a menacé de démissionner ! 3 March 2026 Shaffaf Exclusive
    • En Arabie saoudite, le retour au réalisme de « MBS », contraint d’en rabattre sur ses projets pharaoniques 27 February 2026 Hélène Sallon
    • À Benghazi, quinze ans après, les espoirs déçus de la révolution libyenne 18 February 2026 Maryline Dumas
    • Dans le nord de la Syrie, le barrage de Tichrine, la forteresse qui a résisté aux remous de la guerre civile 17 February 2026 Hélène Sallon
    RSS Recent post in arabic
    • تقييم متشائم: بأُمرة “الحرس” مباشرةً، 30 الف مقاتل في حزب الله ومعركة طويلة 13 March 2026 خاص بالشفاف
    • 500 ألف دولار شهريا لنبيه برّي لدعم نفوذ إيران في بيروت 12 March 2026 إيران إنترناشينال
    • بالفيديو والصور: بلدية صيدا “قَبَعت” القرض الحسن من شارع رياض الصلح! 12 March 2026 خاص بالشفاف
    • “طارق رحمن”: الوجه الجديد في عالم التوريث السياسي 12 March 2026 د. عبدالله المدني
    • صفقة التمكين الأخيرة: السودان ينزع عباءة الأيديولوجيا تحت وطأة المقصلة الأمريكية 12 March 2026 أبو القاسم المشاي
    26 February 2011

    Metransparent Preliminary Black List of Qaddafi’s Financial Aides Outside Libya

    6 December 2008

    Interview with Prof Hafiz Mohammad Saeed

    7 July 2009

    The messy state of the Hindu temples in Pakistan

    27 July 2009

    Sayed Mahmoud El Qemany Apeal to the World Conscience

    8 March 2022

    Russian Orthodox priests call for immediate end to war in Ukraine

    Recent Comments
    • hello world on Between fire and silence: Türkiye in the shadow of a growing regional war
    • بيار عقل on Did Iran just activate Operation Judgement Day?
    • Kamal Richa on When Tehran’s Anchor Falls, Will Lebanon Sink or Swim?
    • me Me on The Disturbing Question at the Heart of the Trump-Zelensky Drama
    • me Me on The Disturbing Question at the Heart of the Trump-Zelensky Drama
    Donate
    © 2026 Middle East Transparent

    Type above and press Enter to search. Press Esc to cancel.